Scaffolding pipe
High-Quality Scaffolding Pipe for Construction Projects
Scaffolding pipe is a fundamental component in construction, providing essential support for workers and materials during building projects. Our premium scaffolding pipes meet the highest industry standards for safety and durability.
Key Features of Our Scaffolding Pipes
- Material: High-grade carbon steel (Q235 or Q345)
- Standard: EN39, BS1139, or ASTM A53
- Surface Treatment: Hot-dip galvanized or painted
- Connection Type: Right/left hand threaded couplers
- Length Options: 0.5m, 1m, 1.5m, 2m, 2.5m, 3m, 4m, 5m, 6m
Technical Specifications
| Parameter | Value |
|---|---|
| Outer Diameter | 48.3mm (standard) |
| Wall Thickness | 3.2mm, 3.5mm, 4.0mm |
| Tensile Strength | ≥410 Mpa |
| Yield Strength | ≥235 Mpa |
| Elongation | ≥20% |
Scaffolding Pipe FAQs
Q: What is the maximum load capacity for standard scaffolding pipe?
A: The load capacity depends on wall thickness and material grade. Our standard 48.3mm OD pipe with 4.0mm wall thickness can support approximately 19.5kN axial load and 1.86kN/m distributed load when used in scaffolding systems. Always consult engineering specifications for exact requirements.
Q: How often should scaffolding pipes be inspected?
A: Scaffolding pipes should be inspected before initial use, after any modifications, and at regular intervals (minimum weekly for professional construction sites). Look for dents, corrosion, bent sections, or damaged threads. Galvanized pipes typically last 15-20 years with proper maintenance.
Q: Can different brands of scaffolding pipes be mixed in one structure?
A: We strongly recommend against mixing scaffolding pipe brands. Different manufacturers may have slight variations in diameter, wall thickness, or threading that can compromise structural integrity. Always use matching components from the same supplier for optimal safety and performance.
Applications
Our scaffolding pipes are suitable for:
- Building construction and maintenance
- Bridge construction
- Shipbuilding and repair
- Event staging and temporary structures
- Industrial maintenance projects
Packaging and Shipping
| Length | Bundle Quantity | Weight per Bundle |
|---|---|---|
| 6m | 91 pcs | ~3000kg |
| 3m | 182 pcs | ~3000kg |
| 2m | 273 pcs | ~3000kg |
Additional Scaffolding Pipe FAQs
Q: What climate conditions are scaffolding pipes suitable for?
A: Our galvanized scaffolding pipes perform well in temperatures from -20°C to +60°C. For extreme cold (below -20°C), special low-temperature steel grades are available. In coastal areas with high salinity, we recommend additional corrosion protection.
Q: How do I calculate the quantity needed for my project?
A: A basic rule is 4m of scaffolding pipe per square meter of vertical surface. For precise calculations, consider: working height, bay length (typically 2-2.5m), lift height (2m standard), and required platform levels. Our technical team can provide detailed material estimates for your specific project.
Q: What's the difference between scaffolding pipe and scaffold tube?
A: These terms are often used interchangeably, but technically pipes have threaded ends for coupler connections, while tubes are plain-ended for use with clamp systems. Our scaffolding pipes use the coupler connection system which provides stronger, more stable joints compared to clamp systems.
Quality Assurance
All our scaffolding pipes undergo rigorous testing:
- Dimensional accuracy checks
- Wall thickness verification
- Surface quality inspection
- Zinc coating thickness measurement (for galvanized pipes)
- Load-bearing capacity tests
Why Choose Our Scaffolding Pipes?
- Manufactured to international standards
- Consistent quality across all batches
- Competitive pricing with bulk discounts
- Flexible customization options
- Technical support available
Final Scaffolding Pipe FAQs
Q: Can scaffolding pipes be recycled?
A: Yes, steel scaffolding pipes are 100% recyclable. At end-of-life, they can be melted down and reused. Galvanized pipes require special handling at recycling facilities due to the zinc coating, but most modern recycling centers can process them efficiently.
Q: What's the lead time for scaffolding pipe orders?
A: Standard sizes are typically available from stock with 3-5 day processing. Custom lengths or special coatings may require 2-3 weeks production time. Large orders (over 100 tons) may need additional lead time - please consult our sales team for exact schedules.
Q: Do you provide accessories with the scaffolding pipes?
A: We offer complete scaffolding systems including couplers, base plates, adjustable jacks, and ledger braces. These can be ordered separately or as complete kits. All accessories are precision-engineered to match our pipe dimensions for perfect fit and maximum safety.
